![]() ![]() ![]() T76 hollow bar was used for this project for its ease of use in restrictive jobsites, such as low headroom conditions. was awarded the contract for this parking garage expansion and worked closely with their project partner, Nucor Skyline. The schedule for this project was very aggressive and that combined with the caving soil conditions and the low-overhead conditions inside the original parking structure make this a great job for hollow bar. The low-overhead conditions make it very difficult to bring in the necessary equipment and such was the case at the Pala Casino project site. Opening its doors in 2001, the Pala Casino Resort and Spa has gone through two expansions and is embarking on its third and largest to date.Įvery area of the resort will be updated and the $170-million dollar expansion and renovation project will include an increase of the casino floor, a multi-pool entertainment complex, construction of a new 349-room tower hotel, an expansion of the spa, and three new levels of parking, which will add an additional 400 spaces to the current garage space.Įxpanding an existing parking garage is always challenging. The Pala Casino Resort and Spa, located in the San Diego area was the first of a kind, Las Vegas-style luxury hotel to open in Southern California. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |